SignAcctPro
Pricing

How to Price Channel Letters, Installation Included

Photo of S. A. SahirS. A. Sahir·November 21, 2026·8 min read

Channel letters are one of the best jobs a sign shop can win, and one of the easiest to lose money on. The letters themselves are rarely the problem. The money leaks out in the parts nobody wrote down: the second trip to the site, the permit drawing, the bucket truck that sat waiting, the raceway nobody priced.

After thirty years around sign work, I have seen the same pattern again and again. Shops that price by "feel" or by the inch alone do fine on simple jobs and lose on the hard ones, which are exactly the jobs that take the most time. Here is a calmer way to build the number.

Start with what the customer is really buying

A customer asking for channel letters is not buying letters. They are buying a lit sign on their building, approved by the city, that works on opening day. So your quote has to cover five things, not one:

  1. The letters: returns, faces, backs, trim cap, LEDs and power supplies.
  2. The mounting: flush mount, raceway, or a backer panel.
  3. The paperwork: site survey, permit drawings, permit fees, landlord approval.
  4. The installation: crew hours, equipment, electrical connection, travel.
  5. The risk: the things that go wrong on real jobs.

If any one of these is missing from your quote, you are paying for it yourself.

Step 1: Price the letters by the inch, then check by the job

Most shops quote letters per inch of height per letter. It is quick and customers understand it. Build your per-inch rate from your own numbers:

  • Aluminium returns and backs, acrylic faces, trim cap
  • LED modules (count them by stroke length, not by guess) and power supplies
  • Fabrication labor: bending, routing, welding or riveting, painting, wiring and testing
  • Your shop overhead per hour, not just wages

Then do the check most shops skip: add up the real hours for this exact job. A run of narrow script letters takes far longer than block letters of the same height. Per-inch pricing hides that. If the hours say more than the per-inch total, the hours win.

A simple rule: price by the inch for speed, then sanity-check by hours. Quote whichever is higher.

Step 2: Price the mounting honestly

Raceway mounting is faster on the wall but needs its own fabrication, paint to match the fascia and its own electrical feed. Flush mounting looks cleaner but means more holes, more sealing and a penetration for each letter. A backer panel adds material and a second install step. Each one deserves its own line, so the customer sees why options cost different amounts.

Step 3: Never give away the paperwork

The site survey, the permit drawing, the landlord submittal and the city fees are real work. Many shops do them for free to "win the job" and then lose the job anyway. Charge for the survey, and offer to credit it against the order if the customer goes ahead. Pass permit fees through at cost plus your handling time. If the city rejects a drawing and you redraw it, that time is part of the job too.

Step 4: Build installation from the site, not from habit

Installation is where most channel letter quotes go wrong. Before you price it, know:

  • Mounting height and what equipment that needs (ladder, scaffold, lift or bucket truck)
  • The wall: brick, block, EIFS or metal panel all install differently
  • Where power is, and whether a licensed electrician must make the final connection
  • Parking, traffic control and working-hour limits at the site
  • Travel time both ways, for every person in the crew

Price the crew by hours times people, add equipment by the day (not by the hour you hope to use it), then add travel. A two-person crew for six hours with a bucket truck for a day is a very different number from "install: included".

Step 5: Add a line for risk, and name it

Some walls hide surprises. Some landlords change their mind. Some cities take three rounds of comments. Add a small contingency on complex jobs, and write down what your price does not include: structural work, repairing an old fascia, removing an old sign, or after-hours install. A clear exclusions list prevents more arguments than any contract clause.

A worked example

Here is how the pieces add up for a simple storefront. The figures are only an example to show the method; use your own costs and local rates.

LineHow it is builtExample
Letters12 letters × 24" × your per-inch rate$4,320
RacewayFabrication, paint match, wiring$650
Survey and permit drawingSite visit + drawing time$350
Permit feeCity fee + handling$275
Installation2 people × 6 hours + bucket truck day + travel$1,180
Contingency5% on a simple wall$340
Total$7,115

Notice that the letters are only about sixty percent of the total. A shop that quoted "letters plus a bit for install" could easily be two thousand dollars short on this job.

The mistakes that eat your margin

  • Quoting before the survey. A price without site measurements is a guess.
  • One price for every wall. EIFS and brick are not the same job.
  • Forgetting the second visit. Inspection, electrician, or a missing part all mean another trip.
  • Free permit work. It feels generous; it is unpaid labor.
  • No written exclusions. Whatever is not excluded, the customer will assume is included.
  • No follow-up on the quote. Many lost jobs were never lost, just forgotten.

One more thing that belongs in the price: the letters have to pass inspection. In the US, Article 600 of the National Electrical Code requires electric signs, including channel letters shipped as sections, to be listed and installed the way the listing says, and most shops get that listing under UL 48. If your shop is not listed yet, the cost of getting there, or of buying listed letters from a wholesaler, is part of every lit job you quote.

And if the job has a pole or a footing, someone calls 811 before anyone digs. It is free and it is the law in every state, but it takes a couple of working days, so put it in the schedule.

Make the method repeatable

The method above works on paper or in a spreadsheet. The trouble starts when three people quote three ways, or when last year's rates are still sitting in someone's head. We built SignAcctPro so a sign shop can keep its per-inch rates, install rates and standard exclusions in one place, turn the quote into a job when the customer says yes, and see later whether the job actually made the money it was supposed to.

Whatever tool you use, the rule is the same: price everything the customer is really buying, and write it down where your whole team can see it.

Sources and further reading

  1. Electric sign certification: UL 48 and NEC Article 600, UL Solutions
  2. Using LEDs in electric signs and letters (listing and grounding of channel letters), IAEI Magazine
  3. Article 600: Electric Signs and Outline Lighting, EC&M
  4. Help with sign permits and variances, International Sign Association
  5. Call before you dig (811), US Pipeline and Hazardous Materials Safety Administration

Questions.

How do sign shops price channel letters?

Most shops start with a rate per inch of letter height per letter, built from materials, LEDs, fabrication hours and overhead. They then add mounting, survey, permits, installation and a contingency as separate lines, and check the total against the real hours the job will take.

Should installation be priced separately from the letters?

Yes. Installation depends on the wall, the height, the equipment, the electrical connection and travel, so it changes from site to site. Showing it as its own line makes the quote fairer and easier to explain.

Should I charge for the site survey and permit drawings?

Yes. They are real work. A common approach is to charge for the survey and credit it against the order if the customer goes ahead, and to pass permit fees through at cost plus handling time.

What should a channel letter quote exclude?

Write down anything you are not doing: structural work, fascia repair, removing an old sign, after-hours installation, or primary electrical work by others. Clear exclusions prevent disputes later.

S. A. Sahir
S. A. Sahir

Founder of AMZE Studio and creator of SignAcctPro. Thirty years in graphic design; designing signs for sign companies since 2015. Read his story.

Try it in your shop

Quote, design, build and get paid in one place

14 days free, every feature, no card needed.

Keep reading

More from the blog.

What Goes Into a Monument Sign Quote

The full checklist for quoting a monument sign: survey, engineering and wind loads, footing, permits, 811 locates, power, fabrication and installation.