A monument sign looks simple from the road. It is a box on a base with a name on it. Then you quote one, and you discover it is really a small construction project that happens to have a sign on top.
That is why monument signs produce the widest spread of quotes in the trade, and why shops that quote them like a big wall sign get burned. Here is everything that belongs in the number, in the order you will meet it on the job.
1. The site survey
Before any price, someone needs to stand where the sign will stand. Things to record:
- Setbacks from the property line, the road and any easements
- Sight lines for drivers at the entrance (cities care a lot about this)
- Ground: slope, soil, irrigation, landscaping that must be moved or restored
- Where the nearest power is, and how far a trench would run
- Access for a digger, a crane or a boom truck
Charge for the survey and credit it against the order. It is real work, and it is the difference between a quote and a guess.
2. The sign code and the permit
Local sign codes set maximum height, maximum area, setbacks, lighting rules and sometimes materials. Read the code before you design, not after. If the customer wants more than the code allows, a variance may be possible, but it adds time and cost, so price it as its own line. The International Sign Association offers help to sign companies with difficult permits and variances, and it is worth knowing that exists.
Permit fees, drawing time and the second round of city comments all belong in the quote.
3. Engineering
Many cities require stamped structural drawings for freestanding signs above a certain height. The threshold changes from place to place: some ask for engineering on monument signs taller than about six feet, some only above eight, and some for every freestanding sign. Check the local rule every time.
The engineer designs for wind, using the wind speed and exposure for that exact location under ASCE 7, the US standard for structural loads. You will see these on the drawings: a design wind speed, an exposure category, and a concrete strength for the footing. On the coast, the same sign can need a much bigger footing than it would inland. That is why a monument quote copied from another city is a risky quote.
4. The footing and 811
Before anyone digs, call 811. It is free, it is the law in every state, and the utilities have a few working days to mark their lines. Build that wait into the schedule.
Then price the footing from the engineered drawing: excavation, rebar, anchor bolts or embedded steel, concrete, inspection, and spoil removal. Rock, groundwater or a buried pipe that was not on any map are the classic surprises. Your exclusions should say who pays if they appear.
5. Power
A lit monument needs power, which may mean a trench across a car park or under a lawn, conduit, a disconnect, and a licensed electrician for the final connection. Like any electric sign in the US, the sign itself will need to be listed, usually to UL 48, and installed under Article 600 of the National Electrical Code. Trenching is often the most underestimated line on the whole quote.
6. The sign itself
- Base: masonry, stone veneer, aluminium cladding over a steel frame, or foam with a hard coat
- Cabinet: routed faces, push-through letters, dimensional letters or a changeable panel
- Lighting: internal LEDs, halo, ground-mounted floodlights
- Finish: paint system, anti-graffiti coat if the site needs it
If masonry is involved, decide early whether your crew or a subcontracted mason does it, and get their price before you quote.
7. Installation and restoration
Crew, equipment by the day, travel, setting the sign, final electrical connection, inspection, and putting the landscaping back the way you found it. That last one is easy to forget and customers notice it immediately.
The checklist
| Stage | Line on the quote |
|---|---|
| Before design | Site survey, code review |
| Paperwork | Permit drawings, permit fees, variance (if any), engineering |
| Ground work | 811 locate, excavation, footing, inspection, spoil removal |
| Power | Trenching, conduit, disconnect, electrician |
| Sign | Base, cabinet, faces or letters, lighting, finish |
| Install | Crew, equipment, travel, setting, connection, restoration |
| Risk | Contingency, written exclusions (rock, water, unknown utilities) |
A shop that quotes every one of these lines will sometimes be more expensive than a competitor. It will also be the shop that finishes the job without a fight about who pays for the rock.
In SignAcctPro every job carries its own checklist, due dates and install notes, so a list like this travels with the monument job from survey to install, and nobody has to remember the trench at nine o'clock at night.
Structural and electrical requirements vary by location. This article explains common practice; the local building department and a licensed engineer have the final word.
Sources and further reading
- Structural submittal requirements for signs (PDF), Montgomery County, Maryland
- Sign permit structural requirements (PDF), City of Bellevue, Washington
- Help with sign permits and variances, International Sign Association
- Call before you dig (811), US Pipeline and Hazardous Materials Safety Administration
- Electric sign certification: UL 48 and NEC Article 600, UL Solutions